Unalam manufactured the glulam stringers for three interior bridges in this new educational facility. Our fabrication department had to cut channels in the stringers, where handrails will later be attached.
We do a lot of exterior pedestrian bridges, but interior ones are more rare. These bridges span approximately 40 feet between concrete slabs, crossing atrium space at the 2nd, 4th, and 5th floors of the building.
No comments:
Post a Comment